Studies on Magnet Serial Production for FAIR

 

Costing for the industrial serial production of superconducting magnets for accelerators.

The following magnets were the objects of the study:

  • 120 fast-ramped SIS 100 dipoles: (4T/s) Option: Yoke on 4 K or 80 K respectively
  • 180 SIS 100 quadrupoles Super FRS dipoles, warm yoke, 24 CR dipoles, warm yoke
  • 42 NESR/RESR dipoles with warm yoke, ramped (1T/s ramp rate); reduction of eddy currents for the cryostat

Customer: GSI Darmstadt

Project duration: 2003 - 2004